Asked | Open questions | Answered
Points Date Pair Term / Answer given Level Status Gloss
- Jan 17 '23 por>eng Paradão Complete shut down..total work stoppage pro closed no
- Jan 8 '22 por>eng COB fim do expediente pro closed ok
4 Sep 4 '21 por>eng morto Stable arch...arching pro closed ok
- Aug 23 '20 por>eng desmonte da pega blasting the pegmatite pro just_closed no
4 Aug 28 '19 por>eng Malha de corte Screen Mesh pro closed ok
4 Aug 3 '19 por>eng frentes carregadas loaded blast holes pro closed ok
4 Aug 3 '19 por>eng período de disparos blast times pro closed ok
4 Aug 3 '19 por>eng disparos de bancada e mini-bancada Bench and mini bench blasts pro closed ok
4 Jun 28 '19 por>eng pá carregadora de mina Mine Front Loader pro closed ok
- Jun 28 '19 por>eng ponte rolante e porta contentores overhead crane with spreader pro closed no
- Apr 26 '18 por>eng rejeitoduto Tailings pipeline pro closed no
- May 11 '16 por>eng quando da ocorrência... when the fissuring occurred pro closed ok
- Nov 4 '15 por>eng Minério de ferro granulado granulated iron ore...iron ore granulate pro closed no
- Oct 27 '12 por>eng ponteação tack welding pro closed ok
4 Jan 5 '12 por>eng lamas e lodos mud and silt pro closed ok
4 Apr 22 '11 por>eng Sistema de abatimento de pó na descarga dedusting system pro closed ok
4 Apr 22 '11 por>eng passante em .. mm the particles passed through the 12 mm screen..the particles which pass through the 12 mm screen.. pro closed ok
4 Apr 22 '11 por>eng Plano Diretor do Empreendimento Project Master Plan pro closed ok
- Apr 22 '11 por>eng teores médios de alimentação de cada período supply concentrations for each period pro closed ok
4 Apr 22 '11 por>eng cangas Hardpans pro closed ok
4 Apr 22 '11 por>eng ITM Ore treatment plant pro closed ok
- Apr 21 '11 por>eng hematitinha hematite fines pro closed no
4 Apr 22 '11 por>eng recuperação mássica mass recovery pro closed ok
- Apr 21 '11 por>eng cava operacional final final excavation pro closed ok
- Apr 21 '11 por>eng Conjunto Caldeiraria da Planta metal fabrication shop..Sheet metal shop pro closed no
- Apr 20 '11 por>eng grelha screen pro closed ok
- Apr 18 '11 por>eng mínimo esforço de trabalho minimum working strength pro closed ok
4 Mar 29 '11 por>eng LAVRA mining site => prospect => claim => claim area pro closed ok
4 Mar 1 '11 por>eng chave de fim-de-curso e de sobre curso de segurança Limit Switch ...Over Travel-limit Switch pro closed ok
- Aug 16 '09 por>eng lapidação faceting and/or cabbing easy closed no
- Aug 4 '09 por>eng dúctil maleable pro closed ok
- Sep 12 '08 por>eng contra recuo anti-reverse mechanism..anti-reverse control.anti-reverse rotation device.anti-reverse-rotation memb pro just_closed no
- Sep 12 '08 por>eng vento serviço/vento de serviço Working wind load pro just_closed no
4 Sep 12 '08 por>eng sobrecurso overtravel pro closed ok
- Sep 17 '07 por>eng Cumbadores bolt anchors..fasteners...manual verification of unstable rock fragments pro open no
3 Sep 6 '07 por>eng PEDRARIA Bead Store..Bead Shop pro closed ok
4 Jul 25 '07 por>eng milonitizada milonitized pro closed ok
- Jul 15 '07 por>eng dois sentidos de deslocamento bidirectional Movement..bi-directional movement pro closed ok
4 Jul 15 '07 por>eng aço do tipo pré-tracionada Prestressed steel pro closed ok
4 Sep 9 '06 por>eng Mineração/ exploração mining..exploration pro closed ok
4 Sep 3 '06 por>eng Eixo deslocado/centralizado - Diamantes displaced center line..centered center line pro closed ok
4 Sep 3 '06 por>eng elementos vazados (diamantes) perforated signature .."perforated engraving" pro closed ok
4 May 28 '06 por>eng Breu pitch pro closed ok
- May 13 '06 por>eng RCD Direct Purchase List pro closed ok
2 Mar 5 '06 por>eng abóbada dos fornos elétricos dome, arched roof pro closed ok
- Mar 4 '06 por>eng saídas para equipamentos atendidos equipment output terminals pro closed ok
- Feb 20 '06 por>eng rota dos efluentes wastewater routing pro closed ok
- Nov 7 '05 por>eng tubovia references pro closed ok